Container Home Inspection Checklist — On Arrival
Quick answer
When your container home arrives, inspect the frame for corrosion or transit damage, check the panels, seals, windows and doors, confirm the dimensions match the specification, and verify the internal finish and services. Photograph anything wrong immediately and report it before placement.
- Inspect the frame and panels for damage
- Check seals, windows, doors and the finish
- Confirm dimensions against the specification
Get your exact quote on WhatsApp
Frame and structure
Check the frame, corners and panels for dents, corrosion or distortion from transit. Note anything that could affect the structure.
Seals and openings
Check the seals around windows, doors and joints. Openings are the likeliest point of leak, so they matter most.
Dimensions
Confirm the folded and expanded dimensions and the weight match the specification. These affect your foundation and lifting plan.
Internal finish and services
Verify the internal finish matches what was ordered, and check the wiring runs and service points before connecting anything.
Document everything
Photograph any issue and report it straight away, before placement, so any claim is straightforward.
Getting started
Tell us the unit you want and your nearest port for a quote. Bank transfer in full; delivery port-to-port (FOB).
Frequently asked questions
How is payment handled?
Payment is by bank transfer in full before production.
How are units delivered?
Units ship folded and are delivered port-to-port (FOB). You arrange local transport from the port to your site.
Can I order more than one unit?
Yes. Multi-unit orders ship together, which lowers the freight cost per unit.
Get your exact quote: message us on WhatsApp.
Tariffs, duties and shipping are extra.