Quick answer
Preparing land for a container home means clearing and levelling the site, ensuring drainage, designing a foundation for the soil and frost, providing access for the truck and crane, and bringing water, power and waste to the point of use. Doing this before delivery keeps the project on schedule.
- Clear, level and drain the site first
- Design the foundation for soil and frost
- Provide access and services before delivery
Get your exact quote on WhatsApp
Clear and level
Clear vegetation and obstructions, then level the area where the unit will sit. A level base is what keeps the frame true.
Handle drainage
Direct water away from the base so the steel never sits in standing water. Good drainage protects the unit from below.
Design the foundation
A slab, strip footings or screw piles sized for your soil, slope and frost depth. In cold regions, the frost line decides the footing depth.
Provide access
Check the route in for the delivery truck and crane: gate widths, overhead lines and ground bearing. If they cannot reach the pad, the unit cannot be placed.
Bring in services
Water, power and drainage to the point of use before the unit arrives, so it is not left idle waiting for connections.
Ordering
Send your size and site details and your nearest port for a quote. Bank transfer in full; delivery port-to-port (FOB).
Frequently asked questions
Do you offer financing?
No. Payment is by bank transfer in full before production.
How are units delivered?
Units ship folded and are delivered port-to-port (FOB). You arrange local transport from the port to your site.
Can I order more than one unit?
Yes. Multi-unit orders ship together, which lowers the freight cost per unit.
Get your exact quote on WhatsApp: message us.
Tariffs, duties and shipping are extra.