Quick answer

On-site assembly of a container home runs in stages: ground preparation and foundation, placement of the unit, expansion, service connections, and finishing touches. Because the unit arrives internally finished, the on-site work is mainly foundations and connections. Delivery is port-to-port (FOB); payment is by bank transfer in full.

Get your exact quote on WhatsApp

Stage 1: ground and foundation

The site is levelled and drained, then a foundation or pads are set to suit the unit and the ground conditions. Getting this right is what keeps the unit level and true.

Stage 2: placement

The unit arrives folded and is lifted onto the prepared foundation. Check site access for the delivery vehicle and lifting equipment before the day.

Stage 3: expansion

If the unit is an expandable model, the sections are opened and locked into their final position. The structure becomes rigid once deployed.

Stage 4: services

Water, power and drainage are connected. Running these after the unit lands means it sits idle, so prepare them while it is in transit.

Stage 5: finishing

Final internal and external touches, such as external landscaping or steps, complete the project. Because the unit is internally finished, this stage is short.

Ordering

Send your size, layout and nearest port for a quote covering unit and freight. Bank transfer in full; delivery port-to-port (FOB).

Frequently asked questions

How is payment handled?

Payment is by bank transfer in full before production.

How are units delivered?

Units ship folded and are delivered port-to-port (FOB). You arrange local transport from the port to your site.

Can I order more than one unit?

Yes. Multi-unit orders ship together, which lowers the freight cost per unit.

Get your exact quote: message us on WhatsApp.

Tariffs, duties and shipping are extra.

What to check before you commit

Three checks prevent most problems. First, confirm what your local authority will classify the unit as once it is permanently sited, and get that in writing. Second, get a local price for the work after the port — haulage, lifting, foundation and connections — because those costs are not related to the unit price and are where budgets move. Third, ask for the structural drawings and the insulation specification before you order.

On the unit itself, look at four things: how the shell was reinforced at every opening, what insulation is used and how the vapour strategy works, what documentation arrives with the electrical installation, and what the structural warranty actually covers. A supplier who can answer all four promptly is building to a standard you can inspect.

On payment and delivery, understand the terms clearly before committing: units are sold port-to-port (FOB) with payment by bank transfer in full before production, and the buyer arranges local transport and site works from the arrival port.

Getting a real number

Send your destination postal code and the model you are considering, and we take that to a customs broker and return an all-in delivered figure — unit, ocean freight, duty and brokerage — usually within one business day. There is no online checkout and no obligation: the quote opens the conversation rather than closing it.

Payment is by bank transfer in full before production, and units are delivered port-to-port (FOB); you arrange local transport from the arrival port to your site. We work factory-direct with a single vetted manufacturer, so the price you see is the same price a retailer would pay, with no distributor margin layered on top.