Quick answer
Container home electrical work must be planned at order and completed to local code: the steel frame means the shell must be correctly earthed, wiring runs in conduits or insulated channels, and the unit’s systems are matched to your country. On arrival, a local electrician certifies and connects the unit.
- Planned at order, finished to local code
- Steel shell must be earthed correctly
- Local electrician certifies on arrival
Get your exact quote on WhatsApp
Plan early
Circuits, outlets, lighting and the consumer unit are best set at order, when the unit is being built, rather than added later.
Earthing the steel frame
A steel shell needs correct earthing and bonding so the structure is safe. This is a core part of the electrical plan.
Cable routing
Wiring runs in conduits or insulated channels to protect it and keep it clear of the steel, which is standard in a well-built unit.
Standards differ by country
Electrical codes vary widely. Tell us the destination so the unit is configured to suit, with final fitting done locally.
Certification on arrival
A local electrician certifies the installation and connects it to the grid or a solar system, which most insurers and councils expect.
Ordering
Tell us your destination and needs and your nearest port for a quote. Bank transfer in full; delivery port-to-port (FOB).
Frequently asked questions
Do you offer financing?
No. Payment is by bank transfer in full before production.
How are units delivered?
Units ship folded and are delivered port-to-port (FOB). You arrange local transport from the port to your site.
Can I order more than one unit?
Yes. Multi-unit orders ship together, which lowers the freight cost per unit.
Get your exact quote on WhatsApp: message us.
Tariffs, duties and shipping are extra.